Storage

Backup

Prioritise essential circuits and required hours before capacity, transfer equipment and operating limits are chosen.

Backup represented by one practical part of the storage energy system.

Which loads need backup first?

Compare inputs

Quick setups
7.5 hours before reserve and system losses.

7h30min

Usable energy
13.5 kWh
Constant load
1.8 kW

Starting loads, reserve and losses can shorten this estimate.